LOCK BEWEGT // LOCK MOVES

CHAPTER 01 – APPLICATIONS Prefab Tubes 27 2023 | 06 Tube – Type B: Drive system with rail mounting > Connection between EWA and LZG with KKS 10 / KKS 14 for 1 1/4“ + 2“ tube > Connecting LZG to LZG with tube type C, SKS 66 or SKS 68 for 1 1/4“ and 2“ > Couplings for other tube dimensions available on request Tube – Type C: LZG – LZG rack & pinion units > Connection with two LZG > Connection of LZG to LZG with SKS 66 and SKS 68 for 1 1/4“ / 2“ tube > Couplings for other tube dimensions available on request LRZ > Length of prefab tube XK > Spacing of chain coupling ZF > Dimension to start of coupling B-side (see p.11 chap. 5) LRX > Length of prefab tube XS > Spacing of welded coupling LX > Spacing of LZG to LZG > LRZ = LZ – ZF – XK > LRX = LX – XS – XS > Our table of figures includes 3 mm of clearance between each shaft and the axial mounting of each coupling! LZ rail distance with SKS without SKS 4000 7860 7760 4500 8860 8760 5000 9860 9760 LRX length Prefab-tube LZG 20 LZG 20 LZ rail distance with SKS without SKS 4000 7820 7720 4500 8820 8720 5000 9820 9720 LZG 24 LZ rail distance LRZ length Prefab-tube with KKS 4000 3665 4500 4165 5000 4665 LZ rail distance LRZ length Prefab-tube with KKS 4000 3685 4500 4185 5000 4685 LZG 24 LRX length Prefab-tube

RkJQdWJsaXNoZXIy NTQ3ODU=